Orinda WTP Disinfection Improvements Project (Postponed until further notice)
This event has been postponed a second time until further notice (anticipated to be Sept/Oct 2026 at the earliest)
. Cancellations for the original dinner events from 4/21/26 and 5/6/26 have been issued, and a refund will be provided shortly to those who already registered.
Registration for the dinner event on the new date will be required via THIS webpage for those who wish to attend on this new date.
For those who signed up for the tour, this has also been postponed until further notice.
Registration for the tour is free (with the use of coupon code) and spots are limited. Priority will be given to students and YMF members.
WHEN: <TBD>, 2026, 5:30 PM to 7:30 PM
Venue: EBMUD TRC
375 11th Street, Oakland
Come learn about East Bay Municipal Utility District’s most expensive single project in its history, the Orinda Disinfection and Chemical Safety Systems Improvements project.
This $341 million project involves a massive improvement to the EBMUD’s most important treatment plant, a must-run facility which serves 800,000 customers.
This project is built 65-feet below ground surface and it includes almost every element of complex underground construction – 72-feet deep secant pile wall walls for excavation support, tie-backs under the existing plant and creek, several tunnels up to 10-foot diameter, automated geotechnical instrumentation, and complex shoring systems for existing structures. Come learn about geotechnical, structural, and hydraulic challenges faced building this project which is wedged in between sensitive wildlife habitat and utility lifelines.
A construction project tour will be provided for a limited number of people prior to the dinner presentation. YMF members have priority for registration. Spots are limited and are first come first served.
Cost: $20 (ASCE members) / $30 (ASCE non-members) / $1 (ASCE Student members)
Dinner is included with the cost of attendance.


Follow The QR CODE for Registration LINK and PAYMENT