GOLDEN GATE BRIDGE SEISMIC RETROFIT PROJECT
WHEN: May 21st, 2026, 5:30 PM to 7:30 PM
Venue: ARUP, San Francisco
560 Mission St, Suite 700, San Francisco 94105
Come learn about the Golden Gate Bridge, Highway Transportation District’s Golden Gate Bridge Seismic Retrofit Project
This $864 Million Project Involves Retrofitting the North and South Side Spans.
This project involves the seismic retrofit of the Suspension Bridge’s two main towers and its two side spans, including the retrofit of the main towers leg bases, strengthening of the stiffening trusses, replacement of the top lateral bracing, retrofit of the bottom lateral bracing, installation of new longitudinal struts, replacement of roadway thermal expansion finger joints with isolation deck joints, and installation of solid state Energy Dissipation Devices.
The Project is Expected to be Completed in 6 Years
Cost: $20 (ASCE members) / $30 (ASCE non-members) / $1 (ASCE Student members)
Dinner is included with the cost of attendance.

Follow The QR CODE for Registration LINK and PAYMENT
Bookings
Log in if you already have an account with us.